T Home Wall Cladding Installation Guide

Step-by-step guide to installing T Home WPC and ASA wall cladding on a ventilated batten frame: battens fixed first with expansion anchors, panels screwed at the seam, no clips.

This guide covers the installation of T Home wall cladding on a ventilated batten frame, fixed with screws at the panel joints. Cladding is a rainscreen: it sheds most of the rain, and the ventilated cavity behind it drains and dries the rest. The system only works if the cavity stays open and the gaps are kept — read this guide in full before the first panel goes up.

1 Profiles covered

  • WPC wall cladding: 01 Normal Standard, 02 3D Embossed, 03 Capped; 219 × 26 mm, 148 × 21 mm, 156 × 21 mm
  • ASA wall cladding: Shiplap, fluted, three-rib, four-rib (9 models); 121–240 mm
Trims and screws are colour-matched to the panels. Twelve ASA colours and the ten WPC standard colours are held across panels and trims, so a facade and the deck below it read as one project.

2 Tools and materials

  • Tape measure; spirit level; 2 m straight edge: T Home cladding panels
  • Circular saw or mitre saw with a fine-tooth blade: Starter trims
  • Drill / driver; 3 mm drill bit: A2 stainless steel screws — silver and black, to match the panel
  • Rubber mallet; 5 mm spacers: A2 screws and expansion anchors
  • Pencil, string line, chalk line: Battens (WPC, treated timber or aluminium)
  • L skirting 45 × 45 mm and 30 × 30 mm; end caps and corner trims
  • Corrosion-resistant insect mesh
Boards, edges and fixings ship as one kit: trims, screws and anchors. Order screws and trims with 3–5% spare so the site never stops for a missing pack.

3 Storage, handling and safety

  • Store panels flat on a level surface, off wet ground and out of direct sunlight.
  • Carry panels on edge or with two people. Do not bend them.
  • Check the model, colour and quantity on delivery. Report any damage before installation starts.
  • Wear gloves and eye protection, and work in a well-ventilated area.
  • Do not burn off-cuts. Keep children away from the work area until the job is finished and tools are stored safely.

4 How the system works

Three parts do the work: the panel sheds rain; the cavity drains and dries; the screw holds the panel without a visible screw head. Cladding is decorative, not load-bearing, so the fixing can be simple: screws at the seam are all it needs — no clips.
  • Ventilated cavity: air enters at the base, rises behind the panels and leaves at the head. It equalises pressure so wind-driven rain is not sucked through the joints, lets any moisture evaporate, and keeps the back of the panels dry.
  • Tongue-and-groove: panels interlock, so the overlap reads as a thin shadow line and no bare core is exposed.
  • Screws at the seam: each panel is screwed through the tongue at the joint into the batten — one screw at every batten the panel crosses. No clips are used. The next panel slides over the tongue and hides the screw heads entirely.

5 Substrate and battens

  • The wall behind the cladding must be sound and dry. Repair loose render and clear dust before the battens go up.
  • Fix battens perpendicular to the panel direction, at 350–400 mm centres.
  • Pack each batten to a true plane: check with a 2 m straight edge; no more than 3 mm of deviation over 2 m.
  • Fix the battens to the wall first, with expansion anchors (nylon plug + screw): drill through the batten into the wall, tap in the plug, drive the screw down. On masonry or concrete, anchors go at 400–600 mm centres along each batten. No panel goes on until the battens are fixed, plumb and flat.
  • Where the wall is uneven, shim the battens until they are plumb and flat — the finished face can only be as true as the battens.
  • In high-rain areas, fit a breathable weather barrier over the sheathing before the battens; it stops bulk water and still lets the wall breathe.

6 Ventilation and drainage

  • Leave a ventilated cavity of at least 20 mm between the back of the panels and the wall or barrier.
  • Leave at least a 10 mm open gap at the base and at the head of every run, so air can move through the cavity.
  • Fit corrosion-resistant insect mesh over the base gap. Keep the cavity clear of mortar, off-cuts and debris.
  • Do not seal the bottom of the cavity shut — trapped moisture is the most common cause of failure.
  • Keep the cavity continuous around windows and doors.

7 Fixing the panels

  1. Mark a level line for the starter trim and fix it along the base. Check it with a spirit level — every panel follows this line.
  1. Seat the first panel in the starter trim. Pre-drill a 3 mm pilot hole through the tongue where a screw is needed.
  1. Drive the A2 screw through the tongue at the joint into the batten — one screw at every batten the panel crosses.
  1. Slide the next panel on so its groove covers the tongue — and the screw heads with it — and tap it home with a rubber mallet against a scrap block.
  1. Check with a level every third panel, not at the end of the wall.
  1. At the perimeter only, screws may go through the panel face into the batten. Everywhere else the fixing stays hidden at the seam.

8 Gaps and movement

Cladding moves with temperature. Fix it tight and it will buckle, split or crush at the joints.
  • End to end (between panel ends): 5 mm
  • Panel end to a solid object: 5 mm minimum
  • Panel side to a solid object: 5 mm minimum
  • Around window and door frames: 5 mm, covered with matching trim
  • Base and head of the run: 10 mm open (ventilation)
Use 5 mm spacers to keep the gaps even. Do not rely on the eye.

9 Openings, corners and finishing

  • Flash window and door openings with waterproof tape before the battens go up.
  • Cut panels around frames, sockets and pipes at the end of the run. Keep the expansion gap, and seal every cut end before final fixing.
  • Close the wall base and the deck edge with L skirting (45 × 45 mm or 30 × 30 mm); the same cap covers both legs.
  • Fix the skirting with screws driven directly through the trim face.
  • Close cut ends with end caps. Corners take corner trim or L skirting.

10 Inspection checklist

  • Level: Starter trim level; panels checked every third row.
  • Gaps: 5 mm gaps even at every joint; 10 mm open at base and head.
  • Fixings: Screws through the tongue at every batten; no face screws except at the perimeter.
  • Cavity: Clear of debris; insect mesh fitted at the base.
  • Finishing: Cut ends sealed; trims and L skirting fitted.
  • Site: Swept clean; off-cuts removed.